Follow along as we build this forever home for 6 individuals with intellectual disabilities.

 

2.14.20 Lighting,flooring and more work on the bathrooms are completed.

1.27.20 WBIR does a great story for Live at Five at Four. See the story here.

10.17.19: Electrical and HVAC rough ins. 

   

10.2.19:  Windows are in. 

      

10.1.19: Roof is set and ready for some RAIN! Windows will be in by the end of the week.

9.26.19: Interior framing has begun.

9.19.19: Trusses going up! 

           

9.18.19:  Beginning stages of the framing. 

          

9.16.19: Pouring the slab.

    

           

9.10.19: Plumbing rough ins. 

     

9.4.19: Laying block and moving gravel.  A very big THANK YOU to Vulcan for their generous gravel donation! 

 

8.21.19: Pouring Concrete Footing